1 – 2 August 2021Edinburgh

1  August 2021Edinburgh

Settled in on the site but a change to the toilet block cleaning they have swapped them around so the one we have used for years now gets cleaned at 1545 ugh. This site has got sanitiser unlike North Berwick that had none but this stuff small like the bottom of a horse box. Ugh again.

m_bridge

Cycled up to Queensferry a 3.5 hour round trip + 10 mins to repair a puncture thanks to the “tack brigade” who love to sabotage cyclists.

r_bridge

4_bridge

Walk in the afternoon to stretch our legs.

2 August 2021Edinburgh

Cycle to Go outdoors for a new innertube (non in stock) carried on up into Edinburgh for coffee and some shopping then back to site. An afternoon cycle down to Cramond harbour.

Leave a Reply

Your email address will not be published. Required fields are marked *